Fixed bridge · moving table · installation planning
Jiangsu Taimu CNC Machine Tool Co., Ltd.
Choose a Taimu gantry with the loaded part and the building in view. The 3-metre GLH-3022T and 6-metre TM-6036T require different load, reach, delivery and foundation plans.
Company, model tables and installation terms reviewed 8 October 2026
- Chinese entity
- 江苏台牧数控机床有限公司
- Published factory location
- Gaoyou, Yangzhou, Jiangsu
- First comparison
- 9,000 kg vs 26,000 kg table load
Put the fixture into the first comparison
Table size, travel and bridge clearance answer different questions. Add the stock, fixture, clamps and accessories to one loaded model before choosing either machine.
| Constraint | GLH-3022T | TM-6036T |
|---|---|---|
| XYZ travel | 3000 / 2200 / 1000 | 6000 / 3600 / 1200 |
| Table / maximum load | 3000 × 1800 / 9,000 kg | 6000 × 3000 / 26,000 kg |
| Between columns | 2200 | 3600 |
| Published passage height | 1250 | 1450 |
| Spindle nose to table | 250–1250 | 250–1450 |
| Listed floor area / height | 8200 × 5300 / 5000 | 15800 × 6700 / 6500 |
| Machine mass | 34,000 kg | 68,000 kg |
Swipe the comparison sideways on a narrow screen.
Before a larger table wins: check loaded width under the bridge, the fixture height plus holder/tool reach, clamp interference and the load distribution. None of the listed travel figures proves that every face can be cut in one setup.

GLH-3022T: start with the 3-metre load plan
The published structure uses a moving table and fixed bridge. Its 9,000 kg table rating and 2200 mm column spacing are separate limits. Plot the part, fixture and tools through the complete machining path.
GLH-3022T model details ↗
TM-6036T: a larger part changes the installation
The 6000 mm X travel and 26,000 kg table rating come with a published 68,000 kg machine mass. Verify unloading, floor preparation, moving-table clearance and service access alongside the component drawing.
TM-6036T model details ↗Get the foundation drawing before preparing the floor
Taimu's installation text calls for buyer-prepared foundations and secondary grouting, with foundation drawings supplied by the seller. It also assigns unloading and positioning to the buyer and requires power and compressed air before commissioning. Turn those published responsibilities into a dated project schedule for the actual destination.
- Delivery route: obtain shipping sections, individual lifting weights, rigging points, doorway limits and the crane/unloading plan. The overall machine mass alone is insufficient for a lift.
- Building and foundation: approve the foundation and anchor/grout details with the site's responsible engineer. Include table movement, chip conveyors, cabinet access, overhead clearance and maintenance routes.
- Commissioning readiness: request the exact incoming electrical, air and fluid schedules. The two source tables list 65 and 75 kVA respectively; confirm included accessories and the final connection schedule before electrical work.
Keep optional heads and raised columns out of the base quote
The TM-6036T specification lists BT50, 40–6000 rpm, FANUC 0i-MF and 22 / 26 kW motor ratings. Its standard-configuration image includes the 6000 rpm spindle, cooling, lubrication and chip removal; a separate options image lists an 828D control, 24-tool magazine, right-angle heads, 2 MPa through-spindle coolant and 200 mm column raising.
Side faces or deep features
Send the required tool-axis directions, holder lengths and fixture model. Request the head envelope, manual/automatic change method and usable travel with the chosen head. A right-angle head is an option, not proof of standard five-face access.
A taller loaded assembly
The TM-6036T raised-column option changes the published nose-to-table range to 450–1650 mm. Obtain a revised machine/guarding layout and prove reach to the lowest feature; extra clearance can also move the minimum spindle reach.
Resolve the GLH spindle discrepancy: its descriptive text says up to 4000 rpm, while its specification and standard-configuration images list 6000 rpm. Specify the spindle, speed range, gear ratio and motor duty in the signed configuration. The 22 / 26 kW pair is published without a clear duty basis.
Agree the sample and both acceptance stages in writing
The model pages describe pre-acceptance and final acceptance at the buyer's site, using the contract's accuracy schedule. They allow an agreed sample cutting test and normally assign test stock, tools and dedicated fixtures to the buyer. Prepare the sample and measurement plan before shipment.
A useful gantry acceptance schedule
- One representative loaded component: material, stock, fixture mass, datum and all machined faces.
- Agreed tools, spindle/head, coolant and control/software configuration.
- Drawing tolerances, measurement locations and inspection equipment for each critical feature.
- Pre-shipment report, accessories inventory and repeated checks after installation/grouting.
- Responsibility for sample material, tooling, inspection and any failed/repeated test.
The published terms also mention deemed acceptance after 30 days when buyer-side delay prevents installation, and after use in an inspection dispute. Review the actual order's acceptance triggers, commissioning dates and dispute procedure before committing; an installation delay should not be left outside the project plan.
A gantry-focused manufacturer with several machine families
The official company account identifies Jiangsu Taimu CNC Machine Tool and a factory address in Gaoyou, Yangzhou. It describes general-purpose, heavy-duty and high-speed gantries plus small and medium vertical machining centers, and a Suzhou operation center. These are manufacturer-published scope statements; this comparison covers the two exact models above, rather than transferring their ratings to the wider catalog.
Company and model material was revisited on 8 October 2026, including the separate specification/configuration images and installation text. Editorial recommendations explain what to ask and test; they do not replace an application-specific engineering proposal or an independent factory inspection.
Send CAD and a marked floor plan
- Stock/finished model, fixture, loaded mass and center of gravity.
- Cut faces, tool directions, deep-feature reach and drawing tolerances.
- Doorways, crane limits, floor/foundation constraints and utilities.
- Required heads/ATC/control, trial plan, destination and commissioning dates.